PlayStation 4 PS4 Xbox One Charging Cable 3 Metre 3m Long Lead USB

- Seller:
- gadget ie
- Feedback:
-
100 4
- Location:
- Drumcondra, Dublin
- 98 more ads from this seller
- Entered/Renewed:
- 1 month ago
- Ad Views:
- 1,236
PlayStation 4 PS4 Xbox One Charging Cable 3 Metre 3m Long Lead USB
Description
Condition:
New
you can collect from Drumcondra beside skylon hotel or city center .
Item Description
The Charge & Play 3 Metre Controller Charge Cable allows the gamer to simultaneously charge and play the PS4 or Xbox One wireless controller.
With a long length of 3 metres (10 feet), this allows comfortable gameplay. No more waiting for your controller to charge!
Features
- Fully compatible with PlayStation 4 (PS4) and Xbox One Controllers for charging and gameplay.
- High quality USB A to Micro USB B cable is expertly designed and offers a smooth and tight connection to the controller.
- Fast charging.
- Works great on smartphones as well.
- Simultaneously charge and play with the wireless Xbox One or PlayStation 4 (PS4) controller.
- 3 metres (10 feet) long.






PlayStation 4 PS4 Xbox One Charging Cable 3 Metre 3m Long Lead USB
- Visa
- MasterCard
- Paypal
- Cash