Browse categories ▾

PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB

PlayStation 4 PS4 Xbox One Charging Cable  3 Metre Long Lead USB
€10 Message
Payment:
  • Visa
  • MasterCard
  • Paypal
  • Cash
Stock:
7 Available
Seller:
gadget ie
Feedback:
Location:
135 more ads from this seller
Entered/Renewed:
3 years ago
Ad Views:
2,653
Viewing 1 of 1
PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB

Description

Condition: New

you can collect from Drumcondra beside Skylon hotel or the city center.

Product Description:
The Charge & Play 3 Metre Controller Charge Cable allows the gamer to simultaneously charge and play the PS4 or Xbox One wireless controller.
With a long length of 3 meters (10 feet), this allows comfortable gameplay. No more waiting for your controller to charge!

Features:
- Fully compatible with PlayStation 4 (PS4) and Xbox One Controllers for charging and gameplay.
- High-quality USB A to Micro USB B cable is expertly designed and offers a smooth and tight connection to the controller.
- Fast charging.
- Works great on smartphones as well.
- Simultaneously charge and play with the wireless Xbox One or PlayStation 4 (PS4) controller.
- 3 meters (10 feet) long.

Shipping: Collection: FreeIreland: €1Europe: €5Rest of world: €5
Payment: PaypalCashCard
From sellers around the web:
Comments
PlayStation 4 PS4 Xbox One Charging Cable  3 Metre Long Lead USB

PlayStation 4 PS4 Xbox One Charging Cable 3 Metre Long Lead USB

€10.00 Message
7 Available
  • Visa
  • MasterCard
  • Paypal
  • Cash

Ask question to seller

You must be logged in to contact the advertiser. Please click here to login.

See more in our Playstation category available today

€5.99
€9.90
€9.00
€15.00
€5.00
€20.00
€7.00
€5.00
€2.00
€10.00
€2.00
€24.00
€5.00
€4.00
€4.00
€25.00